Our work
Jobs since 2018
Our longer jobs and best-known sites, newest first. Where the site is a home or a private development, we give the suburb only.
2026
September 2026 – now Ongoing
Residential site, Terrigal
14 t excavator with operator, auger work and 10-wheeler spoil removal for a renovation builder on the Central Coast.
August – September 2026
Winston Hills
5 t excavator with operator, a bogie truck, and concrete and soil removal for Mr Water Plumbing.
January – April 2026
Penrith Stadium
14 t excavator with operator for Cherrie Civil.
2025
November 2025 – January 2026
North Ryde
Plumbing excavation with a 5 t excavator and hammer, a 1.7 t mini and bogie-truck spoil cartage for Mr Water Plumbing.
2025 – 2026
Giardino Apartments, Bellevue Hill
Concrete cutting and demolition of the crane base, walls, footings, driveway, footpath and kerb, with 14 t and 1.7 t excavators and hammers, for builder Altavale.
May 2025 – September 2026
Holy Family church site, Marayong
Drainage and plumbing excavation for Bear Plumbing, plus asphalt, tank backfill, road base and hardstand packages direct for Grindley, the head contractor.
March – April 2025
Prince of Wales Hospital, Randwick
Excavator-and-tipper combinations removing concrete and soil for Mr Water Plumbing.
March – April 2025
Cremorne
1.7 t excavator with operator for a landscaping contractor.
January 2025 – now Ongoing
Civil works, Huntingwood
14 t excavator with operator, backed by 5 t and 1.7 t machines and a compaction wheel, for Cherrie Civil. Our longest-running job.
January – February 2025
Camperdown
8 t and 1.7 t excavators with operators for Mr Water Plumbing.
2024
November 2024 – March 2025
Chester Hill
Contaminated soil and concrete removal with 14 t, 8 t and 5.5 t excavators, a Bobcat and trucks, for Mr Water Plumbing.
October 2024 – March 2025
Meadowbank
5.5 t and 1.7 t excavators with hammers and operators for Cherrie Civil.
July – October 2024
Plumpton
5.5 t excavator with operator, soil removal and bogie-truck cartage for Mr Water Plumbing.
January – October 2024
Toongabbie
5.5 t excavator with operator over nine months for Mr Water Plumbing.
2023
September – October 2023
Olds Park
5.5 t excavator with operator for Glascott Landscape and Civil.
August 2023 – March 2025
Development site, West Pennant Hills
Excavation over 19 months, including a basement package: 14 t, 5.5 t and 1.7 t excavators with hammers and operators, for Cherrie Civil.
2022
September 2022 – July 2023
Randwick Hospital
5.5 t and 1.7 t excavators with hammers and operators over ten months for Cherrie Civil.
June – July 2022
Showground Station, Sydney Metro
1.7 t and 5.5 t excavators, a tipper and a spotter, working over finished surfaces with floor protection, for Marsupial Landscape Management.
April – July 2022
Bankstown Airport
3.5 t, 5 t and 1.7 t excavators with hammers and a bogie truck for Mr Water Plumbing.
February – September 2022
Waverley
5.5 t excavator with breaker and a 1.7 t mini for Cherrie Civil.
2021
December 2021 – January 2022
St Peters
1.7 t excavator with hammer and operator for Mr Water Plumbing.
September 2021 – January 2022
Girraween
13–14 t excavator with rock breaker, plus 5 t and 1.7 t machines, for Mr Water Plumbing.
August 2021 – February 2022
Wetherill Park
5 t excavator with breaker, a posi-track with sweeper and a 1.7 t mini for Mr Water Plumbing.
July – September 2021
Silverwater
1.7 t and 2.5 t excavators with hammer, a tracked loader, and spoil and concrete removal for Mr Water Plumbing.
May 2021 – May 2022
Kingswood
5.5 t excavator with hammer and a 1.7 t mini over a full year for Cherrie Civil.
May 2021
207 Pacific Highway, St Leonards
Slab demolition, breaking out and shaping.
April – June 2021
Marrickville Metro Shopping Centre
Water tank installation — excavation and preparation, including night works, for Mr Water Plumbing.
February – April 2021
Lane Cove
5.5 t excavator with hammer, sifting bucket and auger for Cherrie Civil.
2020
December 2020 – February 2021
Parramatta
1.7 t and 5 t excavators, wet and dry hire, for Glascott.
September 2020 – July 2021
Waterloo Metro station development
Skilled labour hire on the Sydney Metro site at Waterloo for John Holland.
July 2020 – February 2021
Wahroonga
5.5 t excavator including night shifts, plus dry hire, hammer and auger, for Cherrie Civil.
March 2020 – March 2021
Sydney Football Stadium
Skilled labour hire on the stadium rebuild for John Holland.
2020 – 2021
275 George Street, Sydney
Skilled labour hire for John Holland in the Sydney CBD.
2020
Dillwynia Correctional Centre, Berkshire Park
Skilled labour hire for John Holland.
2018 – 2019
2019
WestConnex M4 East
Site works for the CPB Samsung John Holland joint venture on the M4 East tunnel.
2018 – 2020
Macquarie Park
Skilled labour hire for John Holland over three years.
2018 – 2020
NRT Norwest — Sydney Metro North West
Landscape excavation and site works at Cherrybrook Station, Bella Vista and Showground Road for Glascott.
On site
Gallery
Machines, crews and sites from our recent jobs.
Your job could be on this page next
Tell us what you need done and we will give you a straight answer on cost and timing.
