Our work

Jobs since 2018

Our longer jobs and best-known sites, newest first. Where the site is a home or a private development, we give the suburb only.

2026

September 2026 – now Ongoing

Residential site, Terrigal

14 t excavator with operator, auger work and 10-wheeler spoil removal for a renovation builder on the Central Coast.

August – September 2026

Winston Hills

5 t excavator with operator, a bogie truck, and concrete and soil removal for Mr Water Plumbing.

January – April 2026

Penrith Stadium

14 t excavator with operator for Cherrie Civil.

2025

November 2025 – January 2026

North Ryde

Plumbing excavation with a 5 t excavator and hammer, a 1.7 t mini and bogie-truck spoil cartage for Mr Water Plumbing.

2025 – 2026

Giardino Apartments, Bellevue Hill

Concrete cutting and demolition of the crane base, walls, footings, driveway, footpath and kerb, with 14 t and 1.7 t excavators and hammers, for builder Altavale.

May 2025 – September 2026

Holy Family church site, Marayong

Drainage and plumbing excavation for Bear Plumbing, plus asphalt, tank backfill, road base and hardstand packages direct for Grindley, the head contractor.

March – April 2025

Prince of Wales Hospital, Randwick

Excavator-and-tipper combinations removing concrete and soil for Mr Water Plumbing.

March – April 2025

Cremorne

1.7 t excavator with operator for a landscaping contractor.

January 2025 – now Ongoing

Civil works, Huntingwood

14 t excavator with operator, backed by 5 t and 1.7 t machines and a compaction wheel, for Cherrie Civil. Our longest-running job.

January – February 2025

Camperdown

8 t and 1.7 t excavators with operators for Mr Water Plumbing.

2024

November 2024 – March 2025

Chester Hill

Contaminated soil and concrete removal with 14 t, 8 t and 5.5 t excavators, a Bobcat and trucks, for Mr Water Plumbing.

October 2024 – March 2025

Meadowbank

5.5 t and 1.7 t excavators with hammers and operators for Cherrie Civil.

July – October 2024

Plumpton

5.5 t excavator with operator, soil removal and bogie-truck cartage for Mr Water Plumbing.

January – October 2024

Toongabbie

5.5 t excavator with operator over nine months for Mr Water Plumbing.

2023

September – October 2023

Olds Park

5.5 t excavator with operator for Glascott Landscape and Civil.

August 2023 – March 2025

Development site, West Pennant Hills

Excavation over 19 months, including a basement package: 14 t, 5.5 t and 1.7 t excavators with hammers and operators, for Cherrie Civil.

2022

September 2022 – July 2023

Randwick Hospital

5.5 t and 1.7 t excavators with hammers and operators over ten months for Cherrie Civil.

June – July 2022

Showground Station, Sydney Metro

1.7 t and 5.5 t excavators, a tipper and a spotter, working over finished surfaces with floor protection, for Marsupial Landscape Management.

April – July 2022

Bankstown Airport

3.5 t, 5 t and 1.7 t excavators with hammers and a bogie truck for Mr Water Plumbing.

February – September 2022

Waverley

5.5 t excavator with breaker and a 1.7 t mini for Cherrie Civil.

2021

December 2021 – January 2022

St Peters

1.7 t excavator with hammer and operator for Mr Water Plumbing.

September 2021 – January 2022

Girraween

13–14 t excavator with rock breaker, plus 5 t and 1.7 t machines, for Mr Water Plumbing.

August 2021 – February 2022

Wetherill Park

5 t excavator with breaker, a posi-track with sweeper and a 1.7 t mini for Mr Water Plumbing.

July – September 2021

Silverwater

1.7 t and 2.5 t excavators with hammer, a tracked loader, and spoil and concrete removal for Mr Water Plumbing.

May 2021 – May 2022

Kingswood

5.5 t excavator with hammer and a 1.7 t mini over a full year for Cherrie Civil.

May 2021

207 Pacific Highway, St Leonards

Slab demolition, breaking out and shaping.

April – June 2021

Marrickville Metro Shopping Centre

Water tank installation — excavation and preparation, including night works, for Mr Water Plumbing.

February – April 2021

Lane Cove

5.5 t excavator with hammer, sifting bucket and auger for Cherrie Civil.

2020

December 2020 – February 2021

Parramatta

1.7 t and 5 t excavators, wet and dry hire, for Glascott.

September 2020 – July 2021

Waterloo Metro station development

Skilled labour hire on the Sydney Metro site at Waterloo for John Holland.

July 2020 – February 2021

Wahroonga

5.5 t excavator including night shifts, plus dry hire, hammer and auger, for Cherrie Civil.

March 2020 – March 2021

Sydney Football Stadium

Skilled labour hire on the stadium rebuild for John Holland.

2020 – 2021

275 George Street, Sydney

Skilled labour hire for John Holland in the Sydney CBD.

2020

Dillwynia Correctional Centre, Berkshire Park

Skilled labour hire for John Holland.

2018 – 2019

2019

WestConnex M4 East

Site works for the CPB Samsung John Holland joint venture on the M4 East tunnel.

2018 – 2020

Macquarie Park

Skilled labour hire for John Holland over three years.

2018 – 2020

NRT Norwest — Sydney Metro North West

Landscape excavation and site works at Cherrybrook Station, Bella Vista and Showground Road for Glascott.

See what we do

On site

Gallery

Machines, crews and sites from our recent jobs.

Your job could be on this page next

Tell us what you need done and we will give you a straight answer on cost and timing.